1.    The ________ and ________ are used within individual workbenches to produce the right output products.
A.    Tools and techniques
B.    Procedures and standards
C.    Processes and walkthroughs
D.   Reviews and update
2.    Which is not the software characteristics
A.    Reliability
B.    Usability
C.    Scalability
D.   Maintainability
3.    The principle of Cyclomatic complexity, considering L as edges or links, N as nodes, P as independent paths
A.    L-N +2P
B.    N-L +2P
C.    N-L +P
D.   N-L +P
4.    FPA is used to
A.    To measure the functional requirements of the project
B.    To measure the size of the functionality of an Information system
C.    To measure the functional testing effort
D.   To measure the functional flow
5.    A _____ is the step-by-step method followed to ensure that standards are met
A.    SDLC
B.    Project Plan
C.    Policy
D.   Procedure
6.    Which is not a test Oracle
A.    The existing system (For a bench mark)
B.    The code
C.    Individual’s knowledge
D.   User manual
7.    PDCA is known as
A.    Plan, Do, Check, Act
B.    Plan, Do, Correct, Act
C.    Plan, Debug, Check, Act
D.   Plan, Do, Check, Accept
8.    Which is the non-functional testing
A.    Performance testing
B.    Unit testing
C.    Regression testing
D.   Sanity testing
9.    A Test Plan Outline contains which of the following:
i. Test Items
ii. Test Scripts
iii. Test Deliverables
iv. Responsibilities
A.    i,ii,iii are true and iv is false
B.    i,iii,iv are true and ii is false
C.    ii,iii are true and i and iv are false
D.   i,ii are false and iii , iv are true
10.                       Testing where in we subject the target of the test , to varying workloads to measure and evaluate the performance behaviors and ability of the target and of the test to continue to function properly under these different workloads.
A.    Load Testing
B.    Integration Testing
C.    System Testing
D.   Usability Testing
11.                       Which of the following is the task of a Tester?
                                                             I.      Interaction with the Test Tool Vendor to identify best ways to leverage test tool on the project.
                                                          II.      Prepare and acquire Test Data
                                                       III.      Implement Tests on all test levels, execute and log the tests.
                                                       IV.      Create the Test Specifications
A.    i, ii, iii is true and iv is false
B.    ii,iii,iv is true and i is false
C.    i is true and ii,iii,iv are false
D.   iii and iv is correct and i and ii are incorrect
12.                       What can static analysis NOT find?
A.    The use of a variable before it has been defined
B.    Unreachable ("dead") code
C.    Memory leaks
D.   Array bound violations
13.                       White Box Techniques are also called as:
A.    Structural Testing
B.    Design Based Testin
C.    Error Guessing Technique
D.   Experience Based Technique
14.                       Reviewing the test Basis is a part of which phase
A.    Test Analysis and Design
B.    Test Implementation and execution
C.    Test Closure Activities
D.   Evaluating exit criteria and reporting
15.                       Component Testing is also called as :-
i. Unit Testing
ii. Program Testing
iii. Module Testing
iv. System Component Testing .
A.    i,ii,iii are true and iv is false
B.    i,ii,iii,iv are false
C.    i,ii,iv are true and iii is false
D.   all of above is true
16.                       Which of the following is not a major task of Exit criteria?
A.    Checking test logs against the exit criteria specified in test planning.
B.    Logging the outcome of test execution.
C.    Assessing if more tests are needed.
D.   Writing a test summary report for stakeholders.
17.                       Which of the following is true about Formal Review or Inspection:-
i. Led by Trained Moderator (not the author).
ii. No Pre Meeting Preparations
iii. Formal Follow up process.
iv. Main Objective is to find defects
A.    ii is true and i,iii,iv are false
B.    i,iii,iv are true and ii is false
C.    i,iii,iv are false and ii is true
D.   iii is true and I,ii,iv are false
18.                       The Phases of formal review process is mentioned below arrange them in the correct order.
i. Planning
ii. Review Meeting
iii. Rework
iv. Individual Preparations
v. Kick Off
vi. Follow Up
A.    i,ii,iii,iv,v,vi
B.    vi,i,ii,iii,iv,v
C.    i,v,iv,ii,iii,vi
D.   i,ii,iii,v,iv,vi
19.                       Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is :
A.    System Level Testing
B.    Integration Level Testing
C.    Unit Level Testing
D.   Component Testing
20.                       Methodologies adopted while performing Maintenance Testing:-
A.    Breadth Test and Depth Test
B.    Re-testing
C.    Confirmation Testing
D.   Sanity Testing
1
2
3
4
5
6
7
8
9
10
B
C
A
B
D
B
A
A
B
A
11
12
13
14
15
16
17
18
19
20
B
C
A
A
A
B
B
C
B
A